The finished sub base on the left and the start of the top base on the right.














As we were building the top base we also built the sidewalk from the museum to the statue.














The finished base awaiting the statue.



Return to Site Navigation Page

Museum 1

Museum 2

Museum 3

Museum 4

Museum 5

Museum 6

Falcon 1

T33 - 1

Falcon 3

Falcon 4

T33 - 2

T33 - 3

T33 - 4

T33 - 5

Return to About Sampson